1BR Apartment in Trump International Hotel & Tower Dubai, Trade Center First
About this property
This 1-bedroom, 2-bathroom apartment at Trump International Hotel & Tower Dubai offers 883 sq ft on Sheikh Zayed Road at the entrance to Downtown Dubai, priced from AED 3,596,240 (about AED 4,073 per sq ft), with handover expected in Q4 2031.
Trump International Hotel & Tower Dubai is a joint project between Dar Global and The Trump Organization, their fifth collaboration according to the launch press release. The tower is planned at about 350 metres with 80 floors, combining a Trump hotel, branded residences, a members-only Trump Club and what the developers describe as the world's highest outdoor pool, with two duplex penthouses with sky pools at the top. The Dubai Land Department lists it as project 3691 ("Trump Tower"), registered in April 2025, with 574 units: 252 one-bedroom, 208 two-bedroom, 110 three-bedroom and 2 four-bedroom homes, plus 2 commercial units.
The tower sits on Sheikh Zayed Road at the entrance to Downtown Dubai, with views toward Burj Khalifa and the sea, and DIFC and Dubai Mall a short drive away. In August 2026 The National reported that Dar Global had awarded the podium construction contract to Gulf Asia Contracting and that about 80% of the inventory had been sold.
A one-bedroom with two bathrooms suits a buyer who wants a Trump-branded address on Sheikh Zayed Road at the smallest entry size, either as a city base or a long-term hold.
Agency pages describe a 90/10 payment plan: 20% on booking, 70% in instalments during construction and 10% on handover. Our feed does not list the plan, so confirm the schedule with us before booking.
How does the price compare with Trade Center First? Registered sales in Trade Center First had a median of AED 3,683 per sq ft from 1 January to 1 October 2026 (Dubai Land Department, 135 sales). At about AED 4,073 per sq ft, this unit is around 11% above that median.
What rental yield can investors expect in Trade Center First? The median annual rent was AED 120,000, a gross yield of about 2.3% over the same period (Dubai Land Department, 3,484 Ejari contracts in Trade Center First). Actual returns depend on the unit, floor and market at handover.
When will Trump Tower Dubai be completed? The Dubai Land Department lists the completion date as 31 December 2031, with construction started in January 2026 and at 3.8% at the latest DLD inspection on 10 September 2026.
Prices and availability come from the developer and can change. Contact Platinum Square for current availability, floor plans and the full payment schedule.
Amenities
Location & Lifestyle
Buy or rent in Trade Center First: spanning DIFC and the World Trade Centre on Sheikh Zayed Road, the financial heart of Dubai with premium apartments, the Museum of the Future and Gate Avenue dining steps away, on three metro lines’ worth of connectivity.
Schools nearby
- Citizens School
- GEMS Our Own English High School (near)
Metro & transit
- Financial Centre (Red Line)
- Emirates Towers (Red Line)
- World Trade Centre (Red Line)
Malls & retail
- DIFC Gate Avenue
- City Walk
- World Trade Centre Mall
- The Dubai Mall (near)
Healthcare
- Emirates Hospital Clinic
- Mediclinic DIFC
- American Hospital Dubai (near)
Landmarks
- Museum of the Future
- DIFC
- Emirates Towers
- Dubai World Trade Centre
Similar properties

3BR Apartment in SOL Luxe, Trade Center First

2BR Apartment in SOL Luxe, Trade Center First
